These quality boilers will be installed in the NB1105 Arctic Freezer Trawler and delivered to the owner PF Havborg from the Faroe Islands in 2022.

Steam will be delivered by the MCS Combined Steam Boiler utilising the exhaust heat and is equipped with an MDO atomising burner. PARAT will also deliver an MVH Oil-Fired Smoke Tube Boiler for Hot Water.

Equipment delivery

The system will be delivered with a Feed water tank, water treatment, heat exchangers, hot water boiler, pumps, and surplus steam dumping system. All are controlled by a PARAT-designed PLC system. The Steam System will be used for the trawlers processing plants, the MVH Hot Water Boiler will be used by the central heating system.

The Arctic Freezer Trawler is a Skipsteknisk ST-119 design, being built at Tersan Shipyard in Turkey, and will be delivered to the owner PF Havborg from the Faroe Islands in 2022.

  • Related companies
  • Parat
  • View all news from
  • Parat

In case you missed it

Wärtsilä simulators boost maritime training in China
Wärtsilä simulators boost maritime training in China

Technology group - Wärtsilä and Sinocrew Maritime Services, a globally renowned provider of integrated crew management and marine training services to the international s...

How can the maritime industry benefit from applying AI?
How can the maritime industry benefit from applying AI?

Artificial Intelligence (AI) is having a profound and multifaceted impact throughout the business world, driving a transformation across all sectors by significantly increasing eff...

Maritime Week Africa 2026: Bunkering & fuel insights
Maritime Week Africa 2026: Bunkering & fuel insights

ship.energy will stage Maritime Week Africa 2026 (MWAF26) from 20-22 January 2026 at the Radisson Collection Hotel, Waterfront, Cape Town, South Africa. The 17th edition will con...

vfd